An “Abnormality” Caused the Super Bowl Blackout

From a press release:

Shortly after the beginning of the second half of the Super Bowl in the Mercedes Benz Superdome, a piece of equipment that is designed to monitor electrical load sensed an abnormality in the system.  Once the issue was detected, the sensing equipment operated as designed and opened a breaker, causing power to be partially cut to the Superdome in order to isolate the issue.

An abnormality like…THE ILLUMINATI?!


  1. fuuturetense reblogged this from spiketv
  2. spiketv posted this